RFQ Survey Services for Loop Trail Project

The scope of work includes preparing complete field topography of the Loop Trail project. The topography limits will be per the provided exhibit. Providing traffic control required for conducting survey including a BNSF approved flagger for surveying in BNSF ROW. Survey control/monumentation located and/or established as necessary. Research and calculations of Deed/Right of Way/Property lines for all adjacent properties and ROW within the project limits. CAD generated topography drawing with ROW and property lines per City of Spokane Valley Standards.

Status

Bidding Closed

Bid Date9/27/21 4:00pm

Company & Contacts

City of Spokane Valley

Jeff Morse   jmorse@spokanevalley.org

Location

Spokane Valley, WA

Bidders may download electronic files at no cost. Printed documents are available, at Bidder’s expense, by choosing the “Order” option.